Data centers
200,000 MW of new generation needed in the US over the next decade.
A solar thermal plant. Captures heat by day. Stores it 48 hours. Dispatches firm electricity around the clock. No batteries. No fuel.
Demand is doubling by 2050. Gas generation is meeting the shortfall renewables cannot supply. No commercial technology delivers clean firm power 24/7.
IEA World Energy Outlook · EIA Energy Outlook (Jan 2025)
Proprietary solar collectors capture solar energy and efficiently convert it to heat to charge a proprietary concrete thermal block. Stored heat drives an ORC turbine on demand. Firm power, day and night.
Designed to deliver electricity reliably and sustainably. A clean alternative for retiring generation and unprecedented new demand.
Provides 24/7 generation. Thermodynamically modelled with proprietary AI-integrated model. Patent-pending system.
Material validated 2025. System validation 2026 lab tests.
vs. 25 years for utility-scale PV.
Zero fuel cost. No combustion.
STEGS™ thermal storage block: 20× cheaper per MWh than lithium-ion batteries, with 5× the life expectancy.
AI-integrated thermodynamic model validated. Commercial demonstration 2027/2028.
STEGS™ is the first commercially viable firm renewable baseload platform.
Qualitative comparison of leading power generation options.
STEGS™ deploys across the 8,000 km solar belt. 75% of the world's population. 80%+ of global power consumption. 1.7 million MW of new US capacity over the next decade, 4.5 million MW international.
200,000 MW of new generation needed in the US over the next decade.
EIA Annual Energy Outlook (Jan 2025).
A 105 MW data-center site in Waco, Texas. Phase 1 commercial demonstration. Phase 2 expansion on the same location.
Figures from internal modelling. PPA under active negotiation. Ranges quoted before escalators, renewable attributes, and tax benefits.
2025
Technology validation
Thermal storage tested at 400 °C with CEMEX. System design finalized.
2026
Patent + lab testing
Patent application filed January. Collector and storage cycled by independent labs (Apr–Aug). PPA in negotiation.
2027
Phase 1 build
15 MW commercial demonstration breaks ground. HDR engineering. DPR construction. Texas.
2028
Commercial dispatch
Phase 1 online. Phase 2 (90 MW) under construction on same site.
2030+
Global rollout
1,000+ MW in construction or operation by 2030. 6,500+ MW global by 2035.
Tell us about your load profile and site.